Search results

In All results

Thank you for signing up for our newsletter!

Thank you for signing up for our newsletter!

Pro Tips for Managing Large Valmet D3 Applications

Pro Tips for Managing Large Valmet D3 Applications

Discover how Valmet application engineers efficiently manage large D3 projects using D3Architect, D3Edit, and other tools. Join our insider session to streamline project handling and simplify complex workflows.

Events
HamCogen, third power plant delivery to the same end-customer

HamCogen, third power plant delivery to the same end-customer

4Energy Invest, the parent company of 4HamCogen, is a Belgian-based renewable energy company that aims at creating and managing a portfolio of small to middle-sized biomass-to-energy projects. Valmet has significant experience of cooperation with 4Energy Invest in common power plant projects. We have delivered altogether three power plants to 4Energy Invest. Two of the plants are located at the same site in the township of Amel and the latest one is located in Ham.

Reference
Dalkia Facture - Full-scope solution for biomass processing

Dalkia Facture - Full-scope solution for biomass processing

The delivery included the boiler, flue-gas cleaning and fuel handling systems. For the customer, centralizing the process equipment required for biomass handling with the same supplier reduces the likelihood of delays during construction and ensures that all equipment is seamlessly compatible.

Reference
Vaskiluodon Voima - Replacing Fossil Fuels with Renewable Energy

Vaskiluodon Voima - Replacing Fossil Fuels with Renewable Energy

The biggest biomass gasification plant in the world is the one Valmet completed in late 2012 in the city of Vaasa, Finland. The Valmet Gasifier (formerly CFB gasifier) for Vaskiluodon Voima Oy was built in response to the critical need to reduce the environmental load of traditional coal-fired power plant.

Reference
Tammervoima produces responsible energy from garbage bags

Tammervoima produces responsible energy from garbage bags

‘What a waste of waste’ is no longer valid in Tampere, Finland. In January 2016, Tammervoima Oy’s new power plant went into commercial operation and now turns garbage bags into energy. Valmet’s flue gas cleaning, condensing and automation technologies contribute to its efficient operation.

Reference
The world's largest waste-fired boiler

The world's largest waste-fired boiler

Valmet CFB Boiler in Mälarenergi's waste-to-energy plant in Västerås is the world's largest waste-fired boiler. It serves as a base unit to meet the district heating power needs of Västerås and Hallstahammar municipalities.

Reference
Stora Enso Ostrołęka, Poland

Stora Enso Ostrołęka, Poland

Reference
Success with the Valmet Acoustic Pyrometer at the Xinyuan Power Plant

Success with the Valmet Acoustic Pyrometer at the Xinyuan Power Plant

The continuous measurement of full load furnace temperature is a difficult problem that Xinyuan power plant solved by installing Valmet acoustic temperature measurement system.

Reference
Automation upgrade ensures secure reserve energy at Fingrid's plants

Automation upgrade ensures secure reserve energy at Fingrid's plants

High cybersecurity, virtual servers and a web-based Valmet DNA User Interface enable Fingrid to reliably start up and operate its Tahkoluoto and Vaskiluoto reserve power plants in times of grid disturbances.

Reference