Sellable sack kraft paper in just three days after press section rebuild
Aug 18, 2016
Modular design made the rebuild of the entire press section of PM 5 at Mondi's Štêtí mill very easy. Only one week was needed for commissioning and start-up. Minimized shutdown was achieved as the press section was pre-assembled for fast onsite assembly and it's smart modular design reduced the civil works needed. Also, both technology and automation was supplied by Valmet which ensured smooth project all the way.
All the efficiency figures like time efficiency, material efficiency and speed efficiency have improved compared to the values we had before the rebuild.
Summary
Location | Mondi's Štětí mill in Czech Republic |
Customer challenge |
Outdated press section caused poor web runnability, breaks and high energy consumption |
Solution | Total remake of the press section into center roll based OptiPress Center press section with related machine control system. |
Results |
Improved dryness resulting in better web runnability and less steam consumption.
|
Keywords | Board and paper, Automation, Europe, Rebuilds |
Technical summary
Grade | Brown sack kraft paper |
Basis weights |
60-120 g/m² |
Wire width | 7 400 mm |
Design speed | 1 200 m/min |